Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Reverted from v. 1

...

  1. In Confluence administration, choose General configuration.
  2. Under Administration, choose Scheduled jobs.
  3. Find the scheduledjob.desc.worldViewJobRunner and choose History.
  4. Check the duration of the job. This number can vary widely, depending on how many users and training pages have to be processed.
  5. Based on the duration, set a new schedule interval.

    Tip

    Radbee recommends an interval of maximum at least 15 minutes to keep the load on the system low.